Road and railway construction
At road, railway and dam construction draining of the surface water below the structure, layer separation and filtration has to be handled by installing woven and non woven geotextiles. In case the subgrade’s load capacity does not reach a predefined value, the subgrade can be stabilized using geogrids and woven geotextiles and furthermore the structural thickness can also be reduced
Recommended geosynthetics as solution to problem concerning the application field:
Load capacity of the subgrade almost sufficient, layer separation and surface water drainage is recommended; to reduce cost during construction and increase the lifetime of the road
| Recommended geosynthetic | Function of the geosynthetic | |
|---|---|---|
![]() |
|
|
Load capacity of the subgrade is not sufficient , subgrade stabilization is necessary; the layer thickness of the structure can be significantly reduced, while the lifetime of the road structure is increased
| Recommended geosynthetic | Function of the geosynthetic | |
|---|---|---|
|
![]() |
|
|
|
|
Pavement rut formation on the wearing layer, prevent formations of cracks, increase lifetime of the wearing layer
| Recommended geosynthetic | Function of the geosynthetic | |
|---|---|---|
|
![]() |
|




